In this article I will elaborate that index to what each point mean to do. So this Test plan will include the purpose of test plan i. e to prescribe the scope, approach, resources, and schedule of the testing activities. To identify the items being tested, the features to be tested, the testing tasks to be performed, the personnel responsible for each task, and the risks associated with this plan.

Find what actually you need to include in each index point.

I have included link to download PDF format of this test plan template at the end of this post.

Test Plan Template:

(Name of the Product)

Prepared by:

(Names of Preparers)

(Date)

TABLE OF CONTENTS

1.0 INTRODUCTION

2.0 OBJECTIVES AND TASKS
2.1 Objectives
2.2 Tasks

3.0 SCOPE

4.0 Testing Strategy
4.1 Alpha Testing (Unit Testing)
4.2 System and Integration Testing
4.3 Performance and Stress Testing
4.4 User Acceptance Testing
4.5 Batch Testing
4.6 Automated Regression Testing
4.7 Beta Testing

5.0 Hardware Requirements

6.0 Environment Requirements
6.1 Main Frame
6.2 Workstation

7.0 Test Schedule

8.0 Control Procedures

9.0 Features to Be Tested

10.0 Features Not to Be Tested

11.0 Resources/Roles & Responsibilities

12.0 Schedules

13.0 Significantly Impacted Departments (SIDs)

14.0 Dependencies

15.0 Risks/Assumptions

16.0 Tools

17.0 Approvals

1.0 INTRODUCTION

A brief summary of the product being tested. Outline all the functions at a high level.

2.0 OBJECTIVES AND TASKS

2.1 Objectives
Describe the objectives supported by the Master Test Plan, eg., defining tasks and responsibilities, vehicle for communication, document to be used as a service level agreement, etc.

2.2 Tasks
List all tasks identified by this Test Plan, i.e., testing, post-testing, problem reporting, etc.
3.0 SCOPE

General
This section describes what is being tested, such as all the functions of a specific product, its existing interfaces, integration of all functions.

Tactics
List here how you will accomplish the items that you have listed in the “Scope” section. For example, if you have mentioned that you will be testing the existing interfaces, what would be the procedures you would follow to notify the key people to represent their respective areas, as well as allotting time in their schedule for assisting you in accomplishing your activity?

4.0 TESTING STRATEGY

Describe the overall approach to testing. For each major group of features or feature combinations, specify the approach which will ensure that these feature groups are adequately tested. Specify the major activities, techniques, and tools which are used to test the designated groups of features.

The approach should be described in sufficient detail to permit identification of the major testing tasks and estimation of the time required to do each one.

4.1 Unit Testing

Definition:
Specify the minimum degree of comprehensiveness desired. Identify the techniques which will be used to judge the comprehensiveness of the testing effort (for example, determining which statements have been executed at least once). Specify any additional completion criteria (for example, error frequency). The techniques to be used to trace requirements should be specified.

Participants:
List the names of individuals/departments who would be responsible for Unit Testing.

Methodology:
Describe how unit testing will be conducted. Who will write the test scripts for the unit testing, what would be the sequence of events of Unit Testing and how will the testing activity take place?

4.2 System and Integration Testing

Definition:
List what is your understanding of System and Integration Testing for your project.

Participants:
Who will be conducting System and Integration Testing on your project? List the individuals that will be responsible for this activity.

Methodology:
Describe how System & Integration testing will be conducted. Who will write the test scripts for the unit testing, what would be sequence of events of System & Integration Testing, and how will the testing activity take place?

4.3 Performance and Stress Testing

Definition:
List what is your understanding of Stress Testing for your project.

Participants:
Who will be conducting Stress Testing on your project? List the individuals that will be responsible for this activity.

Methodology:
Describe how Performance & Stress testing will be conducted. Who will write the test scripts for the testing, what would be sequence of events of Performance & Stress Testing, and how will the testing activity take place?

4.4 User Acceptance Testing

Definition:
The purpose of acceptance test is to confirm that the system is ready for operational use. During acceptance test, end-users (customers) of the system compare the system to its initial requirements.

Participants:
Who will be responsible for User Acceptance Testing? List the individuals’ names and responsibility........

Source:
http://www.softwaretestinghelp.com/test-plan-sample-softwaretesting-and-quality-
0
Vote  Vote
Enter your comment:
No Comments For This News

Search News

What's the News?

Post a link to something interesting from another site, or submit your own original writing for the Testing community to read.

Most Popular News

Most Recent User Submitted News